Concrete price per m3 UK: UK Readymix Price Series

The UK Readymix Price Series carries 9 published figures read from 4 sources' own pages; the 6 published figures given by material run from 0.10 to 17.30 percent, read 11 November 2026.

0.1 to 17.3 % Range by material 6 published figures, not one market: read the rows
9 Published figures from 4 source pages, read 11 Nov 2026
4 of 7 Sources read that publish one 57% publish a figure at all
  1. MPA: concrete and mortar sales27 %
  2. DBT building materials and components statistics, monthly commentary17.3 %
  3. MPA: concrete and mortar sales9.3 %
  4. DBT building materials and components statistics, monthly commentary6.7 %
  5. DBT building materials and components statistics, monthly commentary3.3 %
  6. ONS construction output in Great Britain1 %
  7. ONS construction output in Great Britain0.5 %
  8. MPA: construction demand0.5 %
  9. DBT building materials and components statistics, monthly commentary0.1 %
Every published figure, highest first.
Table view
RowValue
MPA: concrete and mortar sales27 %
DBT building materials and components statistics, monthly commentary17.3 %
MPA: concrete and mortar sales9.3 %
DBT building materials and components statistics, monthly commentary6.7 %
DBT building materials and components statistics, monthly commentary3.3 %
ONS construction output in Great Britain1 %
ONS construction output in Great Britain0.5 %
MPA: construction demand0.5 %
DBT building materials and components statistics, monthly commentary0.1 %
  1. 50.1 to 4.58
  2. 14.58 to 9.07
  3. 19.07 to 13.55
  4. 113.55 to 18.03
  5. 18.03 to 22.52
  6. 22.52 to 27
Where the 9 published figures fall, %, in six equal bands from the lowest to the highest.
Bands
BucketValue
0 to 55 figures
5 to 91 figure
9 to 141 figure
14 to 181 figure
18 to 230 figures
23 to 270 figures

4 of the 7 named sources read in full publish a figure; 3 publish none, read 11 November 2026.

By index against quoted price and material and region where published

BreakdownMedianRangeSources
index against quoted price total construction output, three months to July 20260.5 % (one figure)one figure, no range1
index against quoted price total construction output, three months to August 20261 % (one figure)one figure, no range1
material brick deliveries, December 20256.7 % (one figure)one figure, no range1
material block deliveries, December 202517.3 % (one figure)one figure, no range1
material all-work material price index, annual change to December 20253.3 % (one figure)one figure, no range1
material all-work material price index, monthly change to December 20250.1 % (one figure)one figure, no range1
material ready-mixed concrete sales volume, H1 20269.3 % (one figure)one figure, no range1
material ready-mixed concrete sales, first quarter 20260.5 % (one figure)one figure, no range1
region where published London ready-mixed concrete volumes27 % (one figure)one figure, no range1

Every figure, with its source

One row per published figure: the figure as the source's own page publishes it, the page, and the day it was read. A figure that is not on a page we read is not on this one.

SourceFigureBreakdownRead
MPA: concrete and mortar sales27 %London ready-mixed concrete volumes2026-11-11
DBT building materials and components statistics, monthly commentary17.3 %block deliveries, December 20252026-11-11
MPA: concrete and mortar sales9.3 %ready-mixed concrete sales volume, H1 20262026-11-11
DBT building materials and components statistics, monthly commentary6.7 %brick deliveries, December 20252026-11-11
DBT building materials and components statistics, monthly commentary3.3 %all-work material price index, annual change to December 20252026-11-11
ONS construction output in Great Britain1 %total construction output, three months to August 20262026-11-10
ONS construction output in Great Britain0.5 %total construction output, three months to July 20262026-11-10
MPA: construction demand0.5 %ready-mixed concrete sales, first quarter 20262026-11-11
DBT building materials and components statistics, monthly commentary0.1 %all-work material price index, monthly change to December 20252026-11-11
The sentence each figure was read from (9)

Read in full, publishes no figure

3 named sources were read in full on the dates shown and print no usable figure. They are counted, never filled in.

Methodology

Every row is a verbatim sentence read from the named source's own page through our fetch service on the date shown, hash-pinned to the stored read (the sha of the page's visible text; the raw page is mirrored to R2).

4 of the 7 named sources that could be read published a usable figure; 3 published none and are recorded as not published, never filled in; 0 could not be read (blocked, dead or unreachable) and count nowhere.

The headline figures (median, minimum, maximum, quartiles) are over ONE figure per source for each breakdown it prices, in % (a source's median where its page yielded several accepted sentences for one breakdown), so a page that gives figures for several breakdowns gives one for each and N counts 9 figures, never sentences; 42 candidate sentence(s) were refused by a reviewer with the reason recorded.

The fuller derivation this dataset is chartered to grow into (not yet what the figures above are; they are each source's own published figure as read): the official monthly materials price index for ready-mixed concrete and cement joined to the quarterly delivered volume, indexed to a base month, beside the median supplier from-price this charter's own price index measures - which gives the figure neither the statistics nor the trade publishes: the GAP between the official index and what a domestic buyer is actually quoted, per quarter, and the pump's share of a typical 6m³ pour as both move; changed-since on each monthly release

42 candidate sentences on these pages were refused by a reviewer; each refusal and its reason is recorded in the review ledger.

Sources (7)
Cite or embed this figure

The UK Readymix Price Series carries 9 published figures read from 4 sources' own pages; the 6 published figures given by material run from 0.10 to 17.30 percent, read 11 November 2026.

4 of the 7 named sources read in full publish a figure; 3 publish none, read 11 November 2026.

UK Readymix Price Series, index against quoted price total construction output, three months to July 2026: median 0.50 percent across 1 source, read 11 November 2026.

UK Readymix Price Series, index against quoted price total construction output, three months to August 2026: median 1 percent across 1 source, read 11 November 2026.

UK Readymix Price Series, material brick deliveries, December 2025: median 6.70 percent across 1 source, read 11 November 2026.

UK Readymix Price Series, material block deliveries, December 2025: median 17.30 percent across 1 source, read 11 November 2026.

UK Readymix Price Series, material all-work material price index, annual change to December 2025: median 3.30 percent across 1 source, read 11 November 2026.

UK Readymix Price Series, material all-work material price index, monthly change to December 2025: median 0.10 percent across 1 source, read 11 November 2026.

UK Readymix Price Series, material ready-mixed concrete sales volume, H1 2026: median 9.30 percent across 1 source, read 11 November 2026.

UK Readymix Price Series, material ready-mixed concrete sales, first quarter 2026: median 0.50 percent across 1 source, read 11 November 2026.

UK Readymix Price Series, region where published London ready-mixed concrete volumes: median 27 percent across 1 source, read 11 November 2026.

Cite as: "concretepumpinghire.co.uk UK Readymix Price Series", updated 2026-11-11, https://concretepumpinghire.co.uk/datasets/uk-readymix-price-series/.

Embed this figure (plain HTML, no scripts)

0.10 to 17.30 percent

6 of 9 published figures (material), UK Readymix Price Series, across 4 sources, read 11 November 2026

Source: concretepumpinghire.co.uk UK Readymix Price Series

Machine-readable: JSON, CSV, Markdown.

Download the CSV (9 rows, computed 2026-11-11)

Get concrete pump quotes

Two minutes of questions; local concrete pumping contractors quote your actual job. Free, no obligation.

The pour

What are you pouring?

Rough is fine: volume decides a half or full day.

  • Free, no obligation
  • Your details go to at most three contractors
  • Takes about two minutes

Questions this data answers

What is happening to the price and volume of ready-mixed concrete in Great Britain, so a pump day rate can be read as a share of the pour?

The UK Readymix Price Series carries 9 published figures read from 4 sources' own pages; the 6 published figures given by material run from 0.10 to 17.30 percent, read 11 November 2026.

Where do the figures in the UK Readymix Price Series come from?

Every figure is quoted from its source's own page and dated (last read 11 Nov 2026). 7 named sources were read and 4 publish a figure; the 3 that publish none are recorded as not published, never estimated.

Get concrete pump quotes