Guide
Concrete pump hire cost per day: what you are actually paying for
Updated
A concrete pump price looks like a plant rate and behaves like a labour-and-logistics job. Here is how contractors build the number, and where the money leaks on site.
Why nobody can price it down the phone in ten seconds
Concrete pumping prices follow the job, not the machine. Two identical boom pumps on the same day can produce very different invoices:
- one sets up on an open plot, pours 40 cubes off the back of six punctual mixers and is off site by lunch;
- the other spends the morning on a terraced street waiting on part loads, with a banksman standing next to it.
Same machine, same operator, different job. That is why a serious contractor asks about volume, access and concrete supply before quoting. It is also why this site publishes cost drivers rather than a made-up day rate.
Concrete pump price and rates: how pumping is charged
- Day or half-day rate
- The common shape for domestic and small commercial pours: a block of time with an operator, a set amount of hose or reach, and a stated included period on site.
- Rate per cubic metre, with a minimum
- More usual on larger or repeat commercial work. Watch the minimum charge: on a small pour the minimum is the price, and the per-cube figure is decoration.
- Standing or waiting time
- Charged by the hour or part hour once the included time runs out. This is the line that turns a good quote into a bad invoice, so get the rate and the trigger in writing.
- Extras
- Additional hose, out-of-hours or weekend working, banksman, traffic management, abortive visits where the machine cannot set up, and washout disposal if you have not provided somewhere for it.
How much does concrete pump hire cost? What firms publish
Very few firms publish a pumping price at all. Of 21 UK pump and ready-mix suppliers' pages we read on 12 October 2026, two gave a figure and 19 published none:
- EasyMix Concrete lists "Pump Hire from £275" (easymixconcrete.com);
- Pro-Mix Concrete says "Line pump hire in London starts at £275 to £400 per hire for standard residential projects" (pro-mixconcrete.co.uk).
Those are starting prices, so how much to hire a concrete pump for your pour still turns on the variables below. Every read is in the pump hire price index.
Cost of concrete per m3: the ready mix price per m3
The pump price never includes the concrete. So the cost of concrete per m3 is a second line on the job, and pumped concrete cost is the two added together.
No supplier page we read published a ready mix concrete price per m3 we could quote as its own price, so it is recorded as not published. Ask the ready-mix supplier for a delivered price per cubic metre for your mix.
What is published is the direction of the market (read 12 October 2026, in the ready-mix price series):
- the Department for Business and Trade's all-work material price index rose 3.3% in the year to December 2025;
- the Mineral Products Association reported ready-mixed concrete sales down 9.3% in the first half of 2026 against a year earlier.
The eight variables that move your number
- Pump type: line pump or boom, see the comparison, and what firms publish for line pump hire.
- Volume and pour rate: how much concrete, and how fast it can physically be placed.
- Access and ground: room for outriggers on firm ground, clear of drains and cellars. See site access and set-up.
- Reach and overhead obstructions: measured to the far corner of the pour, not to the gate.
- Hose distance: long runs and vertical lifts add pipe, labour and time.
- Standing time and part loads: the pump is charged while it waits on your concrete supplier.
- Distance from the depot: mobilisation is priced, however it is worded.
- Site requirements: banksman, road or footway occupation, and washout.
Four things that genuinely bring the price down
- Book the concrete and the pump to talk to each other. Continuous supply is worth more than any discount you will negotiate on the pump rate.
- Send photos of the access before you book. The cheapest quote is worthless if the machine turns up and cannot set up, and you pay for the visit anyway.
- Get the reach measured to the furthest point of the pour. Under-specifying reach means either extra hose on the day or a second visit.
- Ask for the standing time rate up front and have somewhere ready for washout, so neither becomes an argument at the end of a long day.
Concrete itself is bought separately from the pumping, usually from a ready-mixed supplier by the cubic metre. When you compare pump quotes, compare like with like: some include a set amount of hose and time, some do not.