Line pumps and boom pumps

What does concrete pump hire cost?

£275 2 published prices from 2 providers' own pages, read 11 November 2026. Pump Hire Price Index

Get concrete pump quotes

The pour

What are you pouring?

Rough is fine: volume decides a half or full day.

  • Free, no obligation
  • Your details go to at most three contractors
  • Takes about two minutes

Leave your email and we'll get straight back to you.

  1. We email you the questions a firm needs answered, straight away.
  2. You answer them by reply, or on this site.

What moves the price of a concrete pump: the eight cost drivers

There is no national day rate, and a phone quote without questions is a guess. Pump hire is priced on the job: line pump or boom, cubes, how far the concrete travels, standing time waiting on trucks, depot distance.

Cost driverWhy it moves the priceWhat to ask for on the quote
Line pump or boom pumpDifferent machines entirely. A line pump pushes concrete along hose at ground level; a boom pump places it from a folding arm over walls, scaffold and buildings. Boom machines cost more to own, run and crew.Which pump they are sending, and why that one suits your pour
Volume and pour rateVolume decides whether you are buying part of a day or all of it, and the rate at which concrete can be placed decides how long the gang and the trucks are tied up.Whether the price is a half day, a full day, or per cubic metre with a minimum
Access and set-up spaceOutriggers need firm, level ground clear of drains, cellars and soft fill. Narrow entrances, parked cars and shared driveways can rule a machine out on the day, and a wasted visit is chargeable.A site visit or photos before booking, and confirmation the machine fits
Overhead obstructions and reachPower lines, trees and buildings limit where a boom can be slewed. Reach is measured to the furthest point of the pour, not to the gate.The reach they are quoting and where the pump will actually stand
Hose distance and pipe runsLong hose runs and vertical lifts need extra pipe, extra labour to move it, and slow the pour down. On line pump work this is often the difference between two jobs.How much hose is included and the charge for extra lengths
Standing time and part loadsThe pump is idle while it waits for the next mixer. Late concrete, short loads and a pour that stops and starts are the most common reason a quote and an invoice disagree.The included time, the standing time rate, and when it starts
Distance from the depotMobilisation is real cost: driver hours, fuel and a machine off the yard. Rural sites and sites far from a pumping depot price higher for the same pour.Whether travel is inside the price or added per mile or per hour
Site requirements: banksman, traffic management, washoutSetting up on a road or footway can need permissions and traffic management. A banksman may be needed for reversing mixers. Washout water is highly alkaline and cannot go to a surface water drain.Who supplies the banksman, who arranges any road permissions, and who takes the washout away
Pump Hire Price Index: every published price, with its source
How these figures were put together

Every honest pump quote is built from the same short list of variables. This table is the list, what each does to the number, and the question that pins it down before booking. It carries no headline day rate on purpose: without a volume, an access description and a standing time policy, a rate is a hook, not a price.

Compiled from how concrete pumping is quoted and charged on UK sites: pump type, volume and pour rate, access and set-up, hose distance, standing and part-load time, travel from depot, site management requirements, and washout. Deliberately no monetary figures, because the same machine can be a half day on an open site and a full day with standing time on a tight street 20 miles further out. Use the right-hand column as the checklist against every quote you receive. Reviewed August 2026.

How it works

  1. Tell us the pour: what it is, roughly how many cubes, what the access looks like. Two minutes, no account.

  2. We pass it to concrete pumping contractors covering your postcode, and to no one else.

  3. They ring you with a price for your job, including how they charge for standing time. Compare, book, or walk away.

Concrete Pumping Hire is a free introduction service; we pass your details to plant and pump hire companies who quote you directly. We may receive a fee from providers; you pay nothing and are under no obligation. We are not a pumping contractor and we are not affiliated with the HSE or any other body named on this site. Nothing here is engineering, safety or legal advice: the cost drivers are guidance for comparing quotes, and site-specific decisions belong to the competent people doing the work.

Sources

This site's own datasets, every figure quoted from its source and dated:

  • The median published figure in the Pump Hire Price Index is 275 GBP across 2 sources' own pages (range 275 to 275 GBP), read 11 November 2026.
  • The UK Readymix Price Series carries 9 published figures read from 4 sources' own pages; the 6 published figures given by material run from 0.10 to 17.30 percent, read 11 November 2026.
  1. legislation.gov.uk, Provision and Use of Work Equipment Regulations 1998
  2. HSE, PUWER: using work equipment safely
  3. HSE, workplace transport: vehicles and pedestrians on site
  4. HSE, construction health and safety
  5. gov.uk, waste carrier, broker or dealer registration
Get concrete pump quotes